TY - CONF AB - We consider the problem of expected cost analysis over nondeterministic probabilistic programs, which aims at automated methods for analyzing the resource-usage of such programs. Previous approaches for this problem could only handle nonnegative bounded costs. However, in many scenarios, such as queuing networks or analysis of cryptocurrency protocols, both positive and negative costs are necessary and the costs are unbounded as well. In this work, we present a sound and efficient approach to obtain polynomial bounds on the expected accumulated cost of nondeterministic probabilistic programs. Our approach can handle (a) general positive and negative costs with bounded updates in variables; and (b) nonnegative costs with general updates to variables. We show that several natural examples which could not be handled by previous approaches are captured in our framework. Moreover, our approach leads to an efficient polynomial-time algorithm, while no previous approach for cost analysis of probabilistic programs could guarantee polynomial runtime. Finally, we show the effectiveness of our approach using experimental results on a variety of programs for which we efficiently synthesize tight resource-usage bounds. AU - Wang, Peixin AU - Fu, Hongfei AU - Goharshady, Amir Kafshdar AU - Chatterjee, Krishnendu AU - Qin, Xudong AU - Shi, Wenjun ID - 6175 KW - Program Cost Analysis KW - Program Termination KW - Probabilistic Programs KW - Martingales T2 - PLDI 2019: Proceedings of the 40th ACM SIGPLAN Conference on Programming Language Design and Implementation TI - Cost analysis of nondeterministic probabilistic programs ER -